Gallery
Drone captures, in-progress shots and completed builds from live Vinara sites.
30photos
NELA 1
A phased industrial park masterplan sequencing warehousing blocks, internal roads and utility corridors across the Nelamangala site.
Structural steel and precast panels come together on B1000, with cladding sequenced tower by tower along the erection front.
NELA 2
Reinforced concrete slabs and columns take shape as the site team advances the structural frame ahead of roofing.
Our in-house ready-mix plant keeps pour schedules on time, batching to spec for every active tower on site.
Every reinforcement layout is checked against drawing before pour — a quality gate that runs on every slab, every time.
Full protective gear is non-negotiable on active work fronts, enforced through daily site walks and toolbox talks.
A completed warehouse exterior with dock-levelled loading bays, ready for fit-out and handover to occupier.
Bikaner House
Steel frame and scaffold erection progressing on Block B, with the structural grid locked ahead of envelope works.
Transit mixers and heavy plant staged for round-the-clock material movement between the batching yard and pour fronts.
Precast elements are lifted and set to line and level, cutting cycle time on the NELA 2 structural programme.
Site-wide awareness drives keep every worker and subcontractor aligned on EHS standards and emergency response.
High-bay racking-ready interiors on B900, completed and handed over on programme with full QA sign-off.
Narrow-aisle racking loaded to full height, on a floor slab built to the flatness tolerance high-bay storage demands.
Racking, small-parts storage and floor staging laid out under a clear-span roof with continuous LED lighting.
Selective pallet racking set out on a column grid planned around aisle widths and forklift turning circles.
A long central aisle with clear sightlines end to end, lit evenly from roof-mounted fittings.
A wide operations floor with marked pedestrian routes separating foot traffic from material handling.
Heavy-duty pallet bays served by forklift access, with rack protection at every upright.
Reach-truck aisles sized for high-level picking, on a jointless slab that keeps handling equipment running smoothly.
A large-format distribution building with truck courts, car parking and internal roads planned as one site.
Steel portal frames and roof skylights bring daylight deep into the storage floor and cut lighting loads.
A rooftop solar array above a row of dock doors, with trailers staged in the truck court below.
A bright racking hall stacked to full clear height, with wide aisles for two-way equipment movement.
The full logistics plot from above: building, yards, stormwater drainage and access roads working together.
Numbered dispatch lanes with floor markings guide pallets from racking to the loading docks.
Multi-level racking seen end on, showing the load clearances and bracing that keep deep storage stable.
A column-free warehouse shell at handover: steel frame, insulated envelope and a power-floated concrete floor.
Building footprint, hardstand and landscaping set out to keep truck and car movements fully separated.
Racking portals line a pedestrian aisle, with column guards and end-of-aisle protection throughout.
A material handling bay with charging and parking space set aside for the forklift fleet.
Site Elevation
Grade-A Warehousing
Bengaluru · India
VINARA INFRA LLP
Grow Together