Grow Together.
Vinara Infra LLP — pioneering productivity with technology across warehousing, industrial and infrastructure projects, with an uncompromised commitment to Quality, Health, Safety & Environment.
01 · The Land
213.06 acres under development.
Three parks across Bengaluru, planned as one connected master-plan.
02 · The Build
12 buildings. 31,33,500 sq.ft built-up.
Warehousing and industrial space engineered for speed and scale.
03 · The Standard
Quality, Health, Safety & Environment.
QHSE is not a checklist here — it runs through every site, every shift.
04 · The Legacy
37+ years of engineering.
Grow together with Vinara.
One partner. Every discipline.
Eight integrated capabilities, one accountable team. From foundation to finishing, from earthworks to precast — Vinara delivers the full stack.
Drag to explore
The whole scope, one contract. Need more than one discipline on the same site? We plan, build and hand it over as one accountable team.
Landmarks insteel & concrete.
Completed and in-progress builds — each tracked against real area, client and delivery status.
Live Build Experience- Total built-up area
- 31,33,500 sq.ft
- Buildings
- 12
- Delivered
- 06
- In progress
- 06
Walk our sites before you visit.
Orbit each campus in real time, tap any building and step inside the warehouse.
Live 3D · NELA 1 · 4 buildings
Our Work
A selection of signature projects
NELA 1 Master Plan
Block B1000 Rising
NELA 2 Structural Works
RMC Batching Yard
Reinforcement Inspection
PPE Compliance
Block B500 Handover
Bikaner House Block B
Fleet & Logistics
Precast Installation
Safety Awareness Rally
Block B900 Handover
NELA 1 Master Plan
A phased industrial park masterplan sequencing warehousing blocks, internal roads and utility corridors across the Nelamangala site.
Block B1000 Rising
Structural steel and precast panels come together on B1000, with cladding sequenced tower by tower along the erection front.
NELA 2 Structural Works
Reinforced concrete slabs and columns take shape as the site team advances the structural frame ahead of roofing.
RMC Batching Yard
Our in-house ready-mix plant keeps pour schedules on time, batching to spec for every active tower on site.
Reinforcement Inspection
Every reinforcement layout is checked against drawing before pour — a quality gate that runs on every slab, every time.
PPE Compliance
Full protective gear is non-negotiable on active work fronts, enforced through daily site walks and toolbox talks.
Block B500 Handover
A completed warehouse exterior with dock-levelled loading bays, ready for fit-out and handover to occupier.
Bikaner House Block B
Steel frame and scaffold erection progressing on Block B, with the structural grid locked ahead of envelope works.
Fleet & Logistics
Transit mixers and heavy plant staged for round-the-clock material movement between the batching yard and pour fronts.
Precast Installation
Precast elements are lifted and set to line and level, cutting cycle time on the NELA 2 structural programme.
Safety Awareness Rally
Site-wide awareness drives keep every worker and subcontractor aligned on EHS standards and emergency response.
Block B900 Handover
High-bay racking-ready interiors on B900, completed and handed over on programme with full QA sign-off.
NELA 1 Master Plan
A phased industrial park masterplan sequencing warehousing blocks, internal roads and utility corridors across the Nelamangala site.
Block B1000 Rising
Structural steel and precast panels come together on B1000, with cladding sequenced tower by tower along the erection front.
NELA 2 Structural Works
Reinforced concrete slabs and columns take shape as the site team advances the structural frame ahead of roofing.
RMC Batching Yard
Our in-house ready-mix plant keeps pour schedules on time, batching to spec for every active tower on site.
Reinforcement Inspection
Every reinforcement layout is checked against drawing before pour — a quality gate that runs on every slab, every time.
PPE Compliance
Full protective gear is non-negotiable on active work fronts, enforced through daily site walks and toolbox talks.
Block B500 Handover
A completed warehouse exterior with dock-levelled loading bays, ready for fit-out and handover to occupier.
Bikaner House Block B
Steel frame and scaffold erection progressing on Block B, with the structural grid locked ahead of envelope works.
Fleet & Logistics
Transit mixers and heavy plant staged for round-the-clock material movement between the batching yard and pour fronts.
Precast Installation
Precast elements are lifted and set to line and level, cutting cycle time on the NELA 2 structural programme.
Safety Awareness Rally
Site-wide awareness drives keep every worker and subcontractor aligned on EHS standards and emergency response.
Block B900 Handover
High-bay racking-ready interiors on B900, completed and handed over on programme with full QA sign-off.
The world’s most demanding operators.
- AGP Industrial Logistics Parks
CBRE
Amazon
- Bikaner House
- FABS
DHL
- Assetz Industrial Park Pvt Ltd
Turner & Townsend
- Brit Logistics Pvt Ltd
- Vortex Motors
- BWSSB
The people behind the build.
Directors, project leads and site engineers driving delivery across every Vinara programme.
Meet the full teamMr. Vinod L Panchal
Director
Mr. Rajat V Panchal
Director & Managing Director
Mr. Robin Chauhan
Senior Project Manager
Mr. Sanjay Singh
Project Manager

Mr. Rahul Pandey
DPM
Mr. Venu GOPAL
CEO
Name to be added
Billing Head
Name to be added
Quality Head
Name to be added
QHSE Head
Mr. Vinod L Panchal
Director
Mr. Rajat V Panchal
Director & Managing Director
Mr. Robin Chauhan
Senior Project Manager
Mr. Sanjay Singh
Project Manager

Mr. Rahul Pandey
DPM
Mr. Venu GOPAL
CEO
Name to be added
Billing Head
Name to be added
Quality Head
Name to be added
QHSE Head

